Macau Technical Visit
 


Date, time & venue

2017-05-13;08:15 - 16:30;

香港工程師學會-機械,輪機,造船及化工分部

澳門技術訪問團

 

日期及地點: 2017513日,澳门

 

協辦團體/分部: 燃氣及能源分部

 

活動概要

行程安排(待定)

日期

時間

活動內容

地點

513

星期六

 

8:15 – 8:30

領取船票

信德中心3/F東橋登船入口

8:30

乘船到澳門

信德中心上船

9:30

乘搭專巴

北安碼頭

10:00

參觀 CEM

CEM 澳門九澳發電廠

12:30

午餐

銀河百樂門

14:00

參觀 GEG

GEG 澳門銀河

16:30

活動完結及解散

GEG 澳門銀河

 

活動亮點

將于澳門九澳發電廠參觀

·         澳電發電機組;

·         澳電LPG發電機組

將于GEG澳門銀河參觀

·         澳門最大型的冷卻裝置;

·         GEG内部的供電系統;

·         高壓變電機組.

 

報名細則

若欲參加此次活動,請於201751日(含)前報名。活動名額限24人,請填寫並提交報名表 Enrollment form,先到先得。報名費用 每人HKD450/HKD550,。報名者收到通知后,請於2天內將全額費用轉賬至本分部的HSBC賬戶(賬戶名:HKIE-MMNC, 賬戶號碼:025-344888-007)。並將轉賬憑證發送至Email: albany.tam@arup.com

 

若需查詢更多信息,請聯繫Albany TAM, 電話+853 8506 5808

 

報名費用

1.  HKIE-MMNC/HKIE-GE(協辦團體)會員,每人HKD450

2.  會員,每人HKD550

 

費用包含

1.  一張單程香港信德中心到澳門北安碼頭船票

2.  澳門銀河百樂門午餐(包茶或水供應)

3.  北安碼頭->CEM->GEG澳門銀河 專車交通費

 

MMNC保留所有權利,並有權對計劃和費用進行最終調整. 參與者需要自行評估旅遊風險並自行購買旅遊保險。


(Registration deadline May 1, 2017)





Report

Macau received electricity for the first time in 1901 when a French entrepreneur deployed a marine generator set from a vessel onshore to provide lighting on the streets outside Palácio da Praia Grande. Evolving over a century, CEM is now the sole municipal electricity power generator, transmitter and distributor in Macau, serving over 253,000 customers and 24,333 street-lights with a supply reliability of 99.9993% in 2016. Located upstream of the CEM 66kV, 110kV and 220kV transmission network is the China Southern Grid in Zhuhai, China. The power supply from this Grid and the CEM owned power station, Coloane Power Plant, amount separately to 81.95% and 14.98% of the peak electricity demand of over 800MW in the city.
The Coloane Power Plant comprises Plant A and Plant B with an installed generation capacity of 271.4MW and 136.4MW respectively. Plant A possesses six (6) diesel power generators and two (2) diesel-fired steam generation units, whereas Plant B located adjacent to Plant A on a plot reclaimed in 1989 is equipped with one (1) multi-shaft combined-cycle gas turbine unit (CCGT), separately contributing 99.4% and 0.6% of the combined station output.

The CCGT at plant B takes the configuration of 2-on-1 and has two (2) Siemens dual fuel 45MW gas turbines (GT), each fitted with a horizontal type heat recovery steam generator (HRSG), and one (1) Westinghouse 45MW steam turbine (ST), giving a total output of 136.4MW under ISO condition. Commissioned in 2002, the GT consumed light oil initially. Following the availability of natural gas supply in 2008, which shares the same source of the municipal city gas from Zhuhai, the GT started to fire natural gas as the primary fuel. The distributed control system offers the power block with operation flexibility which permits the GT to operate either alone as open cycle unit(s) or when coupled with the HRSG and ST as CCGT. Operation under the CCGT mode can yield a thermal efficiency of 50%, and make possible a low level of nitrogen oxide emission with aid of water injection. Leveraged on its clean generation, Plant B is operating as CEM's base load plant.

As the old generating units reach the end of their useful life, CEM is proposing their replacement with a new CCGT unit(s) in order to maintain generating capacity, while allowing an improved plant efficiency and a reduced emission for a much cleaner generation.

MC Division thanks Dr. Thomas Cheang and his colleagues of CEM for the kind reception of HKIE delegations.

After a sumptuous lunch at a restaurant inside Galaxy Macau, the delegation was greeted by the AVP of M&E Plant Operation for a tour of their operation and back of house (BOH) facilities at Galaxy Macau.

The BOH operation is a mini city of its own equipped with automatic uniform storage and conveying system, master key cabinet, staff own canteen and their own 7/11 store all inside this BOH area. At each work shift change of staff at the Galaxy Macau, the BOH will be handling over 12,000 staff getting themselves ready to report to work.

One of the key plant room visited at this Galaxy Macau tour is their Phase 2 chiller plant room, which may well be one of the largest in Asia, occupying a floor area as large as a standard football pitch. Group photo was taken inside this chiller plant room. The delegation later concluded the tour with a Q&A session inside the meeting room in the BOH and souvenir presentation to Galaxy Entertainment Group. The delegation thanked Mr Antonio Chan and Mr. Abraham Yeung for their time and informative tour of the BOH and plant areas of the Galaxy Macau.

The technical visit was adjourned at around 5:00pm and visiting members of delegations all went separate way to wrap up their evening in Macau or return directly to Hong Kong.
 

 
 

 

 
 
  Home | Contact Us | Copyright | Privacy Policy | Disclaimer | SitemapAdmin