Home
About Us
Activities &
Events
Student & Young Engineer
AESG
BlueTech
Photo Gallery
Links and Archive
 
Events / Activities
 

 
Technical Visit to San Tin Stormwater Pumping Station and Yuen Long Bypass Floodway
 


Date, time & venue

2018-11-23;9:30a.m. to 12:30noon;San Tin Stormwater Pumping Station and Yuen Long Bypass Floodway


Programme Highlights
Yuen Long Bypass Floodway was constructed to mitigate flooding in Yuen Long Town and its peripheral village areas. Yuen Long Bypass Floodway is a 3.8 km long large drainage channel built at the South of Yuen Long Town to intercept 40% of the runoff in the Yuen Long catchment. Members could understand the environmental conservation features incorporated in large-scaled flood prevention projects on site. The tour includes visits to San Tin Stormwater Pumping Station, Yuen Long Bypass Floodway Low Flow Pumping Station and Inflatable Dam, Engineered Wetland and Nam Sang Wai Kam Tin River Estuary. Visitors may also enjoy the scenery of migratory birds flying southbound at Nam Sang Wai.

Registration & Enquiries
This seminar is free of charge and prior registration is required. The number of participants is limited to 28. Applications will be accepted on a first-come-first-served basis with priority given to members of MMNC Division. Only on-line registration via MMNC divisional website http://mc.hkie.org.hk/ shall be accepted for registration. Successful applicants will be notified individually. Attendance certificates will be issued after the event. For enquiries, please contact Mr. Tony Tse at email: tony3810@connect.hku.hk.




Report

 
 

 
 

 

 
 
  Home | Contact Us | Copyright | Privacy Policy | Disclaimer | SitemapAdmin
Copyright ©2008 The Hong Kong Institution of Engineers. All rights reserved.